For project quality, process, and PPAP specialists β tackles "folder complete but production out of control" and "good Cpk, bad Ppk."
Combine with PFMEA (id=38) and Control Plan (id=37) for a three-part APQP series.
PPAP Excel templates sit in the same tank folder for classroom use.
4β5 h: false PPAP case β assign element groups β three-way document drill β MSA+SPC prerequisites.
Two weeks before customer deadline, run an internal mock audit with the checklist; match Run@Rate and sample batches to reports.
Build a separate CSR (element 17) matrix β do not mix with generic lists.
Do not re-date old PPAP; trial data cannot substitute for production-rate initial studies.
Do not force Cpk/Ppk if MSA fails; confirm customer engineering approval before PSW.
After 4M changes, re-submit per CSR β do not assume "minor change, no report."